A CLOSED-LOOP FRAMEWORK FOR POST-SERVICE FAILURE MITIGATION IN HEAVY LIFTING EQUIPMENT: ROOT CAUSE ANALYSIS, FMEA FEEDBACK AND CORRECTIVE ACTION VERIFICATION

Authors

  • Guilherme Silva Pinheiro

DOI:

https://doi.org/10.56238/isevmjv3n1-039

Keywords:

Corrective Maintenance, Root Cause Analysis, FMEA, Cranes, Post-service, Reliability, Occupational Safety

Abstract

Corrective maintenance in heavy lifting equipment is usually treated as the end of a failure event: the crane is repaired, tested and returned to service. This paper argues that the period after the repair, here called post-service, is the stage with the greatest potential to prevent the next failure. Based on a review of the reliability, quality and safety literature published up to 2022, a closed-loop framework is proposed that links six steps: failure recording and containment, evidence collection, root cause analysis, corrective and preventive action, effectiveness verification and standardisation through FMEA and maintenance-plan updates. The framework integrates the 5 Whys, the Ishikawa diagram, the 8D method and the risk prioritisation of IEC 60812 and the AIAG-VDA FMEA handbook. It is illustrated with the analysis of a generic hydraulic hose rupture on a mobile crane. Accident statistics, in which 154 of 297 crane-related deaths in the United States between 2011 and 2017 involved workers struck by objects or equipment, show why recurrence of mechanical failures in lifting equipment must be treated as a safety issue and not only as a cost issue.

References

[1] European Committee for Standardization, Maintenance—Maintenance Terminology, EN 13306:2017. Brussels, Belgium: CEN, 2017.

[2] H. Wang, “A survey of maintenance policies of deteriorating systems,” Eur. J. Oper. Res., vol. 139, no. 3, pp. 469–489, 2002.

[3] R. Ahmad and S. Kamaruddin, “An overview of time-based and condition-based maintenance in industrial application,” Comput. Ind. Eng., vol. 63, no. 1, pp. 135–149, 2012.

[4] A. K. S. Jardine, D. Lin, and D. Banjevic, “A review on machinery diagnostics and prognostics implementing condition-based maintenance,” Mech. Syst. Signal Process., vol. 20, no. 7, pp. 1483–1510, 2006.

[5] J. Moubray, Reliability-Centred Maintenance, 2nd ed. New York, NY, USA: Industrial Press, 1997.

[6] F. S. Nowlan and H. F. Heap, “Reliability-centered maintenance,” Nat. Tech. Inf. Service, Springfield, VA, USA, Rep. AD-A066579, 1978.

[7] U.S. Bureau of Labor Statistics, “Fatal occupational injuries involving cranes,” U.S. Dept. of Labor, Washington, DC, USA, Fact sheet, 2019. [Online]. Available: https://www.bls.gov/iif/factsheets/fatal-occupational-injuries-cranes-2011-17.htm

[8] R. L. Neitzel, N. S. Seixas, and K. K. Ren, “A review of crane safety in the construction industry,” Appl. Occup. Environ. Hyg., vol. 16, no. 12, pp. 1106–1117, 2001.

[9] V. W. Y. Tam and I. W. H. Fung, “Tower crane safety in the construction industry: A Hong Kong study,” Saf. Sci., vol. 49, no. 2, pp. 208–215, 2011.

[10] B. Andersen and T. Fagerhaug, Root Cause Analysis: Simplified Tools and Techniques, 2nd ed. Milwaukee, WI, USA: ASQ Quality Press, 2006.

[11] D. Okes, Root Cause Analysis: The Core of Problem Solving and Corrective Action. Milwaukee, WI, USA: ASQ Quality Press, 2009.

[12] T. Ohno, Toyota Production System: Beyond Large-Scale Production. Cambridge, MA, USA: Productivity Press, 1988.

[13] K. Ishikawa, Guide to Quality Control, 2nd rev. ed. Tokyo, Japan: Asian Productivity Organization, 1986.

[14] M. Rausand and A. Høyland, System Reliability Theory: Models, Statistical Methods, and Applications, 2nd ed. Hoboken, NJ, USA: Wiley, 2004.

[15] R. J. Latino, K. C. Latino, and M. A. Latino, Root Cause Analysis: Improving Performance for Bottom-Line Results, 4th ed. Boca Raton, FL, USA: CRC Press, 2011.

[16] International Electrotechnical Commission, Failure Modes and Effects Analysis (FMEA and FMECA), IEC 60812:2018. Geneva, Switzerland: IEC, 2018.

[17] D. H. Stamatis, Failure Mode and Effect Analysis: FMEA from Theory to Execution, 2nd ed. Milwaukee, WI, USA: ASQ Quality Press, 2003.

[18] AIAG and VDA, FMEA Handbook, 1st ed. Southfield, MI, USA: Automotive Industry Action Group, 2019.

[19] American Society of Mechanical Engineers, Mobile and Locomotive Cranes, ASME B30.5-2021. New York, NY, USA: ASME, 2021.

[20] International Organization for Standardization, Cranes—Inspections— Part 1: General, ISO 9927-1:2013. Geneva, Switzerland: ISO, 2013.

[21] Brasil, Ministério da Economia, Norma Regulamentadora NR-12: Segurança no Trabalho em Máquinas e Equipamentos. Brasília, Brazil, 2019.

[22] International Organization for Standardization, Petroleum, Petrochemical and Natural Gas Industries—Collection and Exchange of Reliability and Maintenance Data for Equipment, ISO 14224:2016. Geneva, Switzerland: ISO, 2016.

[23] B. S. Dhillon, Engineering Maintenance: A Modern Approach. Boca Raton, FL, USA: CRC Press, 2002.

[24] SAE International, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes, SAE JA1011. Warrendale, PA, USA: SAE, 2009.

[25] G. E. Totten, Ed., Handbook of Hydraulic Fluid Technology, 2nd ed. Boca Raton, FL, USA: CRC Press, 2011.

[26] J. Reason, Managing the Risks of Organizational Accidents. Aldershot, U.K.: Ashgate, 1997.

[27] R. K. Mobley, An Introduction to Predictive Maintenance, 2nd ed. Amsterdam, The Netherlands: Butterworth-Heinemann, 2002.

[28] L. Swanson, “Linking maintenance strategies to performance,” Int. J. Prod. Econ., vol. 70, no. 3, pp. 237–244, 2001.

Downloads

Published

2024-02-19

How to Cite

Pinheiro, G. S. (2024). A CLOSED-LOOP FRAMEWORK FOR POST-SERVICE FAILURE MITIGATION IN HEAVY LIFTING EQUIPMENT: ROOT CAUSE ANALYSIS, FMEA FEEDBACK AND CORRECTIVE ACTION VERIFICATION. International Seven Journal of Multidisciplinary, 3(1), e11572. https://doi.org/10.56238/isevmjv3n1-039

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.